The main park includes a capability of two hundred MW though Sandrini II features a capability of a hundred MW. The total expense of the two initiatives weren't disclosed even so, in the course of design, about 200 personnel were employed. The initiatives are predicted to see A few positions https://californiasolarpanels.movie.blog/